Projects
Project Summary
Blende Zn-Pb-Ag Deposit, Yukon (Virtual Tour)
Deposit Model
Project Location and Ownership
Historic Work
| Zone | Historical Resource (tonnes) | Zinc (%) | Lead (%) | Silver (grams/tonne) |
|---|---|---|---|---|
| West Zone | 15,300,000 | 3.04 | 3.23 | 67.5 |
| East Zone | 4,300,000 | 3.05 | 1.31 | 15.1 |
| TOTALS | 19,600,000 | 3.04 | 2.80 | 56.0 |
Note : The tonnage and grade estimates were prepared by Billiton Canada Explorations Inc. prior to the introduction of National Instrument 43-101; there is no current feasibility or pre-feasibility study. A qualified person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves, the Company is not treating the historical estimate as current mineral resources or mineral reserves and the historical estimate should not be relied upon.
| DDH | Zone | From (m) | To (m) | Length (m) | Pb (%) | Zn (%) | Pb+Zn (%) | Ag (g/t) | Cu (%) |
|---|---|---|---|---|---|---|---|---|---|
| B88-002 | West | 8.84 | 14.94 | 6.1 | 9.31 | 7.84 | 17.15 | 140.26 | |
| B88-002 | West | 70.71 | 90.53 | 19.82 | 12.29 | 4.44 | 16.73 | 284.85 | |
| B88-003 | West | 117.96 | 135.94 | 17.98 | 10.13 | 3.7 | 13.83 | 319.57 | |
| Including | 117.96 | 119.5 | 1.52 | 25.8 | 9.67 | 35.47 | 1724.57 | ||
| B90-004 | West | 53.64 | 68.64 | 15 | 6.42 | 3.95 | 10.37 | 57.46 | |
| B90-005 | West | 73.66 | 88.9 | 15.24 | 4.95 | 5.18 | 10.13 | 91.28 | |
| B90-006 | West | 68.73 | 91.64 | 22.91 | 7.97 | 2.52 | 10.49 | 113.16 | |
| B90-009 | West | 15 | 26.92 | 11.92 | 7.14 | 8.2 | 15.34 | 118.74 | |
| B90-015 | West | 35 | 69.55 | 34.55 | 7.77 | 3.68 | 11.45 | 196.41 | |
| B91-038 | East | 98.5 | 122.5 | 24 | 1.37 | 3.78 | 5.15 | 10.07 | |
| B91-047 | West | 145.56 | 150.88 | 5.32 | 4.82 | 11.19 | 16.01 | 64.75 | |
| B91-047 | 150.88 | 180.9 | 30.02 | 1.14 | 4.65 | 5.79 | 35.23 | ||
| B91-047 | 180.9 | 189 | 8.1 | 3.07 | 12 | 15.07 | 102.35 | ||
| B91-060 | West | 261.41 | 269.3 | 7.89 | 0.44 | 0.08 | 0.52 | 501.26 | |
| Including | 261.41 | 263.3 | 1.89 | 1.28 | 0.21 | 1.49 | 1532.57 | ||
| B91-068 | East | 31.9 | 60.3 | 28.4 | 4.43 | 3.84 | 8.27 | 42.14 | |
| B94-081 | 9.24 | 33.5 | 24.26 | 6.68 | 3.72 | 10.4 | 158.09 | 0.5 | |
| Including | Far West | 9.24 | 24.1 | 14.86 | 10.06 | 5.64 | 15.7 | 235.96 | 0.8 |
| Also Including | 11.9 | 18.5 | 6.6 | 17.25 | 7.48 | 24.73 | 304.7 | 0.63 | |
| BE06088 | East | 37.46 | 82.4 | 44.94 | 1.98 | 3.9 | 5.88 | 34.8 | |
| BE07116 | Far West | 10.9 | 11.9 | 1 | 15.2 | 7.58 | 22.78 | 193 | |
| BE08126 | West | 96 | 99 | 3 | 8.82 | 7.8 | 16.62 | 259 | |
| BE08128 | Far West | 27.9 | 49.5 | 21.6 | 3.4 | 2.05 | 5.45 | 52.85 | 0.44 |
| Including | 31.4 | 34.2 | 2.8 | 15.32 | 5.02 | 20.34 | 201.57 | 1.11 | |
| BE08131 | Far West | 35.7 | 38.7 | 3 | 8.05 | 4 | 12.05 | 187 | |
| BE08131 | 41.2 | 43.8 | 2.6 | 10.26 | 2.46 | 12.72 | 102.96 |
*Widths are core widths and are not true widths which are not precisely known.
2017 Exploration Summary
- Engaged Moose Mountain Technical Services (MMTS) to collect metallurgical test work samples and prepare a NI 43-101 Technical Report and Mineral Resource Estimate for the Blende Project.
- Commissioned metallurgist Frank Wright, P.Eng. to direct and oversee Blende Project metallurgical test work studies.
- Conducted consultation with Na-Cho Nyäk Dun First Nation.
- Applied for and received 5-year Class 4 Quartz Mining Approval and 2 Year Land Use Permits.
2018 NI 43-101 Mineral Resource Estimate
On April 11, 2018 Blende Silver announced the Maiden Blende NI 43-101 Mineral Resource Estimate consisting of 32.98MT at 5.03% ZINC EQ INFERRED PLUS 3.65MT at 5.18% ZINC EQ INDICATED*.
| Category | Cutoff | In situ | In situ Grades | In situ Metal Content | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| ZnEq (%) | Tonnage (ktonnes) | ZnEq (%) | Zn (%) | Pb (%) | Ag (gpt) | NSR ($CDN/t) | OXRAT | Zn (Mlbs) | Pb (Mlbs) | Ag (koz) | |
| Indicated | 2.0 | 3,650 | 5.18 | 1.98 | 1.95 | 35.7 | 101.87 | 0.08 | 159 | 157 | 4,192 |
| Inferred | 2.0 | 32,980 | 5.03 | 2.01 | 1.88 | 32.0 | 98.91 | 0.22 | 1,461 | 1,364 | 33,980 |
*Moose Mountain Technical Services NI 43-101 Resource Estimate and Technical Report dated May 25th, 2018.
The Blende Project is a potential bulk tonnage, open pit approach that offers some distinct cost advantages to other advanced Pb/Zn projects in Canada, which are typically underground. Blende Resource mineralization outcrops at surface, is confined to 2 pit shapes approximately 2 kilometres apart (view map) and remains open in areas northwest, southeast and below the “reasonable prospects of economic extraction” open pit shapes. Blende Silver is positioning to conduct a significant drill program in 2019 to test these potential open pit extensions and step out from mineralized drill hole intercepts at the adjacent Far West, Central, Far East and Shanghai Zones within the >6 kilometre-long Blende mineralized corridor. Further metallurgical testing and sampling will be undertaken to provide for a near-term Preliminary Economic Assessment to evaluate future mine planning, metallurgy and project economics.
Tables 2 and 3 below summarize the Blende deposit Indicated and Inferred Resource, respectively, at varying ZnEq cutoffs with the Base Case highlighted at 2% ZnEq (NSR=$CDN39.35).
Table 2. Base Case Mineral Resource (at NSR cutoff grade of $CDN39.35 (ZnEq=2%))
| Pit Area | Cutoff | In situ | In situ Grades | In situ Metal Content | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| ZnEq (%) | Tonnage (ktonnes) | ZnEq (%) | Zn (%) | Pb (%) | Ag (gpt) | NSR ($CDN/t) | OXRAT | Zn (Mlbs) | Pb (Mlbs) | Ag (koz) | |
| West Pit | 1.5 | 2,852 | 5.18 | 1.69 | 2.06 | 41.7 | 101.97 | 0.09 | 106 | 129 | 3,827 |
| 2.0 | 2,585 | 5.54 | 1.78 | 2.21 | 45.0 | 108.93 | 0.10 | 102 | 126 | 3,740 | |
| 2.5 | 2,300 | 5.94 | 1.88 | 2.38 | 49.0 | 116.95 | 0.10 | 95 | 121 | 3,623 | |
| 3.0 | 2,015 | 6.40 | 1.99 | 2.58 | 53.6 | 125.90 | 0.10 | 88 | 114 | 3,472 | |
| 3.5 | 1,733 | 6.91 | 2.11 | 2.79 | 59.1 | 136.02 | 0.10 | 81 | 106 | 3,295 | |
| 4.0 | 1,472 | 7.47 | 2.23 | 3.02 | 65.5 | 147.07 | 0.10 | 72 | 98 | 3,100 | |
| 5.0 | 1,061 | 8.63 | 2.39 | 3.53 | 80.6 | 169.80 | 0.11 | 56 | 83 | 2,750 | |
| East Pit | 1.5 | 1,231 | 3.97 | 2.30 | 1.19 | 11.9 | 78.19 | 0.06 | 62 | 32 | 470 |
| 2.0 | 1,068 | 4.31 | 2.45 | 1.32 | 13.2 | 84.79 | 0.06 | 58 | 31 | 452 | |
| 2.5 | 855 | 4.83 | 2.64 | 1.56 | 15.3 | 94.94 | 0.06 | 50 | 29 | 422 | |
| 3.0 | 647 | 5.49 | 2.84 | 1.89 | 18.5 | 108.06 | 0.07 | 41 | 27 | 384 | |
| 3.5 | 487 | 6.23 | 3.02 | 2.28 | 22.3 | 122.55 | 0.07 | 32 | 25 | 350 | |
| 4.0 | 387 | 6.87 | 3.14 | 2.66 | 25.9 | 135.25 | 0.08 | 27 | 23 | 322 | |
| 5.0 | 288 | 7.71 | 3.24 | 3.20 | 30.6 | 151.75 | 0.08 | 21 | 20 | 283 | |
| Total | 1.5 | 4,083 | 4.82 | 1.87 | 1.80 | 32.7 | 94.80 | 0.08 | 169 | 162 | 4,297 |
| 2.0 | 3,654 | 5.18 | 1.98 | 1.95 | 35.7 | 101.87 | 0.08 | 159 | 157 | 4,192 | |
| 2.5 | 3,155 | 5.64 | 2.08 | 2.16 | 39.9 | 110.98 | 0.09 | 145 | 150 | 4,044 | |
| 3.0 | 2,662 | 6.18 | 2.19 | 2.41 | 45.1 | 121.56 | 0.09 | 129 | 141 | 3,856 | |
| 3.5 | 2,220 | 6.76 | 2.31 | 2.68 | 51.1 | 133.07 | 0.09 | 113 | 131 | 3,645 | |
| 4.0 | 1,859 | 7.35 | 2.42 | 2.95 | 57.3 | 144.60 | 0.10 | 99 | 121 | 3,422 | |
| 5.0 | 1,349 | 8.43 | 2.57 | 3.46 | 69.9 | 165.95 | 0.10 | 76 | 103 | 3,032 | |
| Pit Area | Cutoff | In situ | In situ Grades | In situ Metal Content | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| ZnEq (%) | Tonnage (ktonnes) | ZnEq (%) | Zn (%) | Pb (%) | Ag (gpt) | NSR ($CDN/t) | OXRAT | Zn (Mlbs) | Pb (Mlbs) | Ag (koz) | |
| West Pit | 1.5 | 32,533 | 4.87 | 1.85 | 1.87 | 32.4 | 95.85 | 0.25 | 1,325 | 1,343 | 33,900 |
| 2.0 | 29,538 | 5.19 | 1.96 | 2.00 | 34.7 | 102.09 | 0.24 | 1,278 | 1,300 | 32,955 | |
| 2.5 | 26,623 | 5.51 | 2.07 | 2.12 | 37.1 | 108.41 | 0.24 | 1,217 | 1,245 | 31,773 | |
| 3.0 | 23,293 | 5.90 | 2.20 | 2.28 | 40.3 | 116.17 | 0.23 | 1,128 | 1,172 | 30,185 | |
| 3.5 | 20,037 | 6.34 | 2.32 | 2.47 | 43.9 | 124.66 | 0.23 | 1,024 | 1,089 | 28,306 | |
| 4.0 | 16,815 | 6.83 | 2.44 | 2.69 | 48.4 | 134.42 | 0.22 | 903 | 998 | 26,166 | |
| 5.0 | 11,695 | 7.87 | 2.63 | 3.18 | 58.8 | 154.82 | 0.22 | 678 | 819 | 22,105 | |
| East Pit | 1.5 | 4,296 | 3.27 | 2.21 | 0.74 | 8.1 | 64.28 | 0.06 | 209 | 70 | 1,123 |
| 2.0 | 3,441 | 3.64 | 2.42 | 0.85 | 9.3 | 71.66 | 0.06 | 183 | 65 | 1,024 | |
| 2.5 | 2,552 | 4.13 | 2.67 | 1.02 | 10.9 | 81.18 | 0.06 | 150 | 57 | 894 | |
| 3.0 | 1,658 | 4.87 | 3.00 | 1.32 | 13.8 | 95.91 | 0.06 | 110 | 48 | 736 | |
| 3.5 | 1,113 | 5.68 | 3.26 | 1.71 | 17.4 | 111.81 | 0.07 | 80 | 42 | 621 | |
| 4.0 | 778 | 6.53 | 3.46 | 2.18 | 21.3 | 128.45 | 0.07 | 59 | 37 | 532 | |
| 5.0 | 493 | 7.73 | 3.64 | 2.93 | 27.9 | 152.13 | 0.08 | 40 | 32 | 443 | |
| Total | 1.5 | 36,829 | 4.68 | 1.89 | 1.74 | 29.6 | 92.17 | 0.22 | 1,534 | 1,413 | 35,022 |
| 2.0 | 32,979 | 5.03 | 2.01 | 1.88 | 32.0 | 98.91 | 0.22 | 1,461 | 1,364 | 33,980 | |
| 2.5 | 29,175 | 5.39 | 2.13 | 2.02 | 34.8 | 106.03 | 0.22 | 1,367 | 1,302 | 32,668 | |
| 3.0 | 24,951 | 5.84 | 2.25 | 2.22 | 38.5 | 114.82 | 0.22 | 1,238 | 1,220 | 30,921 | |
| 3.5 | 21,150 | 6.30 | 2.37 | 2.43 | 42.5 | 123.99 | 0.22 | 1,104 | 1,131 | 28,927 | |
| 4.0 | 17,594 | 6.82 | 2.48 | 2.67 | 47.2 | 134.15 | 0.21 | 962 | 1,035 | 26,699 | |
| 5.0 | 12,188 | 7.86 | 2.67 | 3.17 | 57.5 | 154.71 | 0.21 | 718 | 851 | 22,548 | |
Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that mineral resources will be converted into mineral reserves.
Mineral Resource Estimate ZnEq Cutoff Sensitivity (Base Case 2% ZnEq)
- The Mineral Resource Estimate in this disclosure is estimated by Moose Mountain Technical Services (MMTS), an independent mining consulting company.
- The effective date of this Mineral Resource Estimate is March 27, 2018 and includes all Blende Property drill and trench results to the end of 2017.
- This Mineral Resource Estimate represents an increase over the previous Historic (1991) Billiton resource estimate. This is primarily due to additional drilling and increased metal prices, as well as higher confidence in the recoveries due to recent metallurgical testing of both oxide and sulfide material. This deposit has an average oxide content of 21% which allows for recovery of both sulfides and oxides at the recoveries used in this Resource Estimate
- The Historic (1991) Billiton resource estimate was based upon 80 diamond drill holes with assay data. A total of 119 diamond drill holes with assay data and 11 trenches with channel sampling were used in the MMTS Blende NI 43-101 Mineral Resource Estimate. An additional 13 holes drilled in 1991 in the periphery of the deposit were not used in the Mineral Resource Estimate.
- Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
- The Mineral Resource Estimate follows Canadian Institute of Mining, Metallurgy and Petroleum (CIM) standards definitions and guidelines.
- There are no known environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource Estimate.
- The Resource has been constrained by “reasonable prospects for eventual economic extraction” open pits. This was done by creating a Lerchs-Grossman optimized pit using the prices, recoveries, payables and costs as stated below. No penalties were included.
- The Equivalent Zn and NSR metal price assumptions of: $US1.20/lb Zn, $US1.00/lb Pb, and $US19.00/oz Ag and an exchange rate of US$0.80 = $1CDN. Metal recoveries are based on metallurgical studies done in 2017 on both the oxide and sulfides material, and are: 70% Zn, 85% Pb and 90% Ag (10% to Zn concentrate and 80% to Pb concentrate). Payables based on comparable smelter terms and a 3% Net Smelter Return (NSR) Royalty are; 85% Zn, 95% Pb and 80% Ag.
- Mining costs used for the “reasonable prospects of economic extraction” pit shapes are $CDN1.88/tonne for all material within the potential open pits. Processing, G&A, Surface Services and Tailings costs used have a total of $CDN37.50/tonne material milled. Costs are based on comparable Zn-Pb-Ag projects in North America. The exchange rate is US$0.80 = $1CDN. Open pit slopes are 45 degrees.
- The Zinc Equivalent (ZnEq) calculation uses the assumed prices, recoveries and payables resulting in the following equation:
- Internal dilution is accounted for in the block model by calculating whole block grades on 6mx6mx6m blocks.
- Quality Assurance/Quality Control (QA/QC) has been reviewed in 2013 and again in 2018 by MMTS and is considered to industry standards.
- Geologic domains are modelled based on faulting, lithology and grade distribution. Four domains have been modelled, with assays composted to 3m intervals honoring domain boundaries and capped by domain based on cumulative probability plots. Zn, Pb and Ag grades have been interpolated using Ordinary Kriging (OK).
- Indicated Resources must contain at least two drill holes within 30m of the block. Inferred Resources have at least 2 drill holes within 120% of the Variogram Range, with extrapolation of the data limited.
- Density values are based on a correlation of (Zn+Pb) grades and re-assayed intervals from a sampling program undertaken in the summer of 2017.
Project Geology
Mineralization
- Hole 94-81 contained 14.9 m of mineralization assaying 228.4 g/t (6.66 oz/t) silver, 9.71% lead, 5.48% zinc and 0.78% copper from 9.2m to 24.1 m
- Hole 94-84 contained 8.5 m of mineralization assaying 136.1 g/t (3.97 oz/t) silver, 6.74% lead, 3.65% zinc and 2.43% copper from 45.5 m to 54 m
Exploration Program
**A qualified person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves, the Company is not treating the historical estimate as current mineral resources or mineral reserves and the historical estimate should not be relied upon.
- For more information, contact:
- info@vanguardminingcorp.com
- +1 672-533-0348
Projects
Yuty Prometeo Project – Paraguay
The Yuty Prometeo Project consists of the San Jose and Uno Concessions, together covering approximately 90,000 hectares within the highly prospective Paraná Basin in southeastern Paraguay. This project is strategically located adjacent to Uranium Energy Corp.’s (UEC) Yuty Deposit, which currently hosts an NI 43-101 compliant resource of 8.96 million pounds of U₃O₈.
The Yuty Prometeo Project leverages favorable regional geology and existing exploration data, indicating continuity with known uranium mineralization trends that extend from UEC’s nearby holdings.
Yuty Prometeo Project – Paraguay
Yuty Prometeo Project Yuty Prometeo Project – Paraguay Location: Paraná Basin, Southeastern Paraguay Size: ~90,000 hectares (222,395 acres) Status: Early-stage exploration Commodities: Uranium (U₃O₈) Contiguous Operator: Uranium Energy Corp.
Pocitos 1 Lithium Brine Project
Pocitos 1 Lithium Brine Project – Salta, Argentina Location: Salar de Pocitos, Puna Plateau, Salta Province, ArgentinaSize: ~800 hectaresStatus: Advanced exploration stageCommodities: Lithium (brine)Infrastructure Proximity:
Brussels Creek
Summary The Brussels Creek Project is an exploration stage project located in the Kamloops Mining District, British Columbia, Canada, about 24 km west of Kamloops,
Murray Ridge (Pinchi Lake)
The analogous suite of ultramafic intrusions are hosts to widely disseminated, coarse grained awaruite mineralization on the Decar (Murray Ridge) property of the First Point
Georgia Lake West & North
Vanguard Mining’s Georgia Lake North & West lithium properties are contiguous and on trend with RockTech Lithium’s (RCK – CSE) Georgia Lake lithium property, which

Yuty Prometeo Project – Paraguay
Yuty Prometeo Project Yuty Prometeo Project – Paraguay Location: Paraná Basin, Southeastern Paraguay Size: ~90,000 hectares (222,395 acres) Status: Early-stage exploration Commodities: Uranium (U₃O₈) Contiguous Operator: Uranium Energy Corp. (NYSE American: UEC) Target Formation: Upper Permian–Carboniferous Contact Overview The Yuty Prometeo Project consists of the San Jose and Uno Concessions, together covering approximately 90,000 hectares within the highly prospective Paraná Basin in southeastern Paraguay. This project is strategically located adjacent to Uranium Energy Corp.’s (UEC) Yuty Deposit, which currently hosts an NI 43-101 compliant resource of 8.96 million pounds of U₃O₈. The Yuty Prometeo Project leverages favorable regional geology and existing exploration data, indicating continuity with known uranium mineralization trends that extend from UEC’s nearby holdings. Uno Concession Area: ~27,666 hectares (68,368 acres) Contiguous to: UEC’s Yuty Project The Uno Concession has been the focus of historical exploration, including 28 completed drill holes that returned uranium assays ranging from 0.05% to 0.10% U₃O₈. Geophysical surveys, drilling data, and surface sampling collectively suggest the Prometeo block is geologically on-trend with UEC’s adjacent Transandes Block, making it a high-priority target for follow-up exploration and resource delineation. San Jose Concession Area: ~62,210 hectares (153,754 acres) Location: ~100 km NW of

Pocitos 1 Lithium Brine Project
Pocitos 1 Lithium Brine Project – Salta, Argentina Location: Salar de Pocitos, Puna Plateau, Salta Province, ArgentinaSize: ~800 hectaresStatus: Advanced exploration stageCommodities: Lithium (brine)Infrastructure Proximity: Township of Pocitos (~10 km; gas, electricity, accommodation available) Overview The Pocitos 1 Lithium Brine Project is located on the Salar de Pocitos in Salta Province, within the prolific Puna Plateau—one of the most important geological settings for lithium brine deposits globally. The Puna Plateau is characterized by elevated fault-bounded blocks separated by elongated, endorheic (closed) basins that act as natural traps for fluids and host thick evaporite deposits. These closed basins, combined with a dry climate and high rates of evaporation, provide the ideal environment for the accumulation and concentration of lithium-rich brines. Surrounding mountain ranges have a north–south (meridian) orientation and their uplift, driven by block faulting, has shaped the basins and controlled sediment input. The Pocitos and Pozuelos basins are divided by the Cordón de Pozuelos, a prominent structural high composed primarily of Ordovician-age rocks that show slight metamorphism. At the base of the surrounding ranges, extensive coalescing alluvial fans funnel sediments and fluids into the salar system, playing a critical role

Brussels Creek
Summary The Brussels Creek Project is an exploration stage project located in the Kamloops Mining District, British Columbia, Canada, about 24 km west of Kamloops, BC. Mineral tenure consists of 66 cells, covering approximately 13.5 km2. HISTORY From 1969 to 2001, exploration was carried out by a variety of companies on various parts of the property. Of particular note, in 1983 and 1984, AVF Minerals Ltd. staked three claims (Aduf 1, Aduf 2 and Aduf 3 fractions, 4 units) covering approximately 85 ha. The company then conducted a program of general prospecting, establishment of a field grid, geological mapping of 100 ha at a scale of 1:2000 and rock chip geochemistry. Seventy-three representative samples of outcrop materials were assayed for gold, silver and arsenic. Results from this program were encouraging and led to the current interest. In 2019, the area was again staked by David Pollard on behalf of the ADUF Mining Syndicate. No significant field work was carried out in 2019, although a third party took seven representative samples during a site visit in September 2019. In February 2020, the property was optioned to Syber Mining Corp. who subsequently

Murray Ridge (Pinchi Lake)
The analogous suite of ultramafic intrusions are hosts to widely disseminated, coarse grained awaruite mineralization on the Decar (Murray Ridge) property of the First Point Minerals, approximately 60 km northwest. Compositionally, awaruite (Ni2Fe-Ni3Fe) is comprised of approximately 75% nickel, 25% iron and 0% sulfur, and therefore it is considered “natural steel”. Absence of sulfur allows a concentrate to be shipped directly to steel mills without incurring smelting and refining costs, and minimal environmental problems. History The economics of nickel-iron alloy deposits are potentially very favorable as they avoid the significant cost associated with nickel sulphide deposits required for smelting and environmental mitigation and large amounts of energy and acid required for the processing of laterite nickel deposits. Exploration activity in the region dates back to mid 1860’s when placer gold was discovered on lower Fraser and Thompson Rivers. In 1937, a modern exploration followed the discovery of cinnabar (ore of mercury) by J.G. Gray, a geologist with the Geological Survey of Canada, in the Cache Creek limestone on the north shore of the Pinchi Lake. Subsequently numerous other mercury showings were discovered within the Pinchi Lake fault zone in a

Georgia Lake West & North
Vanguard Mining’s Georgia Lake North & West lithium properties are contiguous and on trend with RockTech Lithium’s (RCK – CSE) Georgia Lake lithium property, which is located approximately 160 km northeast of Thunder Bay within the Thunder Bay Mining Division and is host to a number of spodumene-bearing pegmatites. Lithium mineralization was discovered in 1955 and subsequently explored by several historic owners. RockTech acquired the licenses in 2009 and carried out several drill campaigns until 2017. Based on a total of 351 drill holes with a combined length of 47,384 m an NI43-101 compliant resource estimate of 6.58 million tonnes in the measured and indicated category and 6.72 million tonnes in the inferred category was published in August 2018. Majority of pegmatites are hosted by Archaean meta-sediments near large masses of granite: