Projects

Project Summary

Blende Zn-Pb-Ag Deposit, Yukon (Virtual Tour)

Deposit Model

The Blende deposit is a Proterozoic-aged carbonate-hosted massive sulphide deposit with features of both Irish-type and clastic-dominated Zn–Pb deposits (M.Moroskat et.al., Mineral Deposita 2014) and is the largest carbonate-hosted Zn-Pb-Ag deposit in Yukon (M. Robinson and C.I. Godwin, Economic Geology 1995).

Project Location and Ownership

The 100% owned Blende Property consists of 260 quartz mining claims (5,434 hectares) that surrounds Mt. Williams, 64 km north of Keno Hill, Yukon Territory. The Property is centred on a >6 km mineralized corridor that hosts a number of carbonate-hosted Zn-Pb-Ag deposits on the south edge of the Mackenzie Platform, hosted by Middle Proterozoic Gillespie Group dolomite.
In 2005, Blende Silver was granted an option to acquire a 60% interest in the Blende property from Eagle Plains Resources. This 60% has been earned with the completion of $5 million in exploration expenditures on the Blende property, paying $250,000 in cash and the issuance of 1,000,000 common shares of the Company. In November 2008, the remaining 40% of the Blende property was purchased by Blende Silver in return for the issuance of 4,500,000 common shares of the Company. An underlying 3% net smelter royalty remains on the Blende property, 2% of which can be purchased for $2 million.

Historic Work

In the early 1990s, Billiton Resources Canada Inc. conducted exploration work that delineated two mineralized zones on the Blende property. The Blende Deposit was outlined at surface by an open-ended 5 kilometre long soil anomaly with zinc values up to 1%. Billiton drilled 77 holes on the property, totaling > 14,000 meters over 3.2 kilometers of strike length, reporting numerous high-grade intercepts at relatively shallow depths. Subsequent step-out drilling by NDU Resources confirmed the continuation of ore-grade mineralization westward, with the addition of significant copper values.
On the basis of diamond drilling and surface trenching, Historical Mineral Resources for the East and West zone were estimated by Billiton as follows:
Historical Mineral Resource – Blende Property, YT – Billiton 1991
Zone Historical Resource (tonnes) Zinc (%) Lead (%) Silver (grams/tonne)
West Zone 15,300,000 3.04 3.23 67.5
East Zone 4,300,000 3.05 1.31 15.1
TOTALS 19,600,000 3.04 2.80 56.0

Note : The tonnage and grade estimates were prepared by Billiton Canada Explorations Inc. prior to the introduction of National Instrument 43-101; there is no current feasibility or pre-feasibility study. A qualified person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves, the Company is not treating the historical estimate as current mineral resources or mineral reserves and the historical estimate should not be relied upon.

In 2006-2008, Eagle Plains Resources and Blende Silver completed an additional 45 holes for 8,700 meters of drilling. This work when added to the drill programmes that preceded it bring the total historical drilling completed on the Blende property to 132 drill holes totaling 25,192 meters.
Numerous high-grade intersections or wide lower-grade intercepts have been reported by past operators, including (amongst others of lower value):
DDH Zone From (m) To (m) Length (m) Pb (%) Zn (%) Pb+Zn (%) Ag (g/t) Cu (%)
B88-002 West 8.84 14.94 6.1 9.31 7.84 17.15 140.26  
B88-002 West 70.71 90.53 19.82 12.29 4.44 16.73 284.85  
B88-003 West 117.96 135.94 17.98 10.13 3.7 13.83 319.57  
Including   117.96 119.5 1.52 25.8 9.67 35.47 1724.57  
B90-004 West 53.64 68.64 15 6.42 3.95 10.37 57.46  
B90-005 West 73.66 88.9 15.24 4.95 5.18 10.13 91.28  
B90-006 West 68.73 91.64 22.91 7.97 2.52 10.49 113.16  
B90-009 West 15 26.92 11.92 7.14 8.2 15.34 118.74  
B90-015 West 35 69.55 34.55 7.77 3.68 11.45 196.41  
B91-038 East 98.5 122.5 24 1.37 3.78 5.15 10.07  
B91-047 West 145.56 150.88 5.32 4.82 11.19 16.01 64.75  
B91-047   150.88 180.9 30.02 1.14 4.65 5.79 35.23  
B91-047   180.9 189 8.1 3.07 12 15.07 102.35  
B91-060 West 261.41 269.3 7.89 0.44 0.08 0.52 501.26  
Including   261.41 263.3 1.89 1.28 0.21 1.49 1532.57  
B91-068 East 31.9 60.3 28.4 4.43 3.84 8.27 42.14  
B94-081   9.24 33.5 24.26 6.68 3.72 10.4 158.09 0.5
Including Far West 9.24 24.1 14.86 10.06 5.64 15.7 235.96 0.8
Also Including   11.9 18.5 6.6 17.25 7.48 24.73 304.7 0.63
BE06088 East 37.46 82.4 44.94 1.98 3.9 5.88 34.8  
BE07116 Far West 10.9 11.9 1 15.2 7.58 22.78 193  
BE08126 West 96 99 3 8.82 7.8 16.62 259  
BE08128 Far West 27.9 49.5 21.6 3.4 2.05 5.45 52.85 0.44
Including   31.4 34.2 2.8 15.32 5.02 20.34 201.57 1.11
BE08131 Far West 35.7 38.7 3 8.05 4 12.05 187  
BE08131   41.2 43.8 2.6 10.26 2.46 12.72 102.96  

*Widths are core widths and are not true widths which are not precisely known.

2017 Exploration Summary

  • Engaged Moose Mountain Technical Services (MMTS) to collect metallurgical test work samples and prepare a NI 43-101 Technical Report and Mineral Resource Estimate for the Blende Project.
  • Commissioned metallurgist Frank Wright, P.Eng. to direct and oversee Blende Project metallurgical test work studies.
  • Conducted consultation with Na-Cho Nyäk Dun First Nation.
  • Applied for and received 5-year Class 4 Quartz Mining Approval and 2 Year Land Use Permits.

2018 NI 43-101 Mineral Resource Estimate

On April 11, 2018 Blende Silver announced the Maiden Blende NI 43-101 Mineral Resource Estimate consisting of 32.98MT at 5.03% ZINC EQ INFERRED PLUS 3.65MT at 5.18% ZINC EQ INDICATED*.

While a direct comparison with the historic 1991 Billiton resource estimate is not possible owing to differences in the drill hole database, cutoff grade, metal prices, estimated metal recoveries, payables and resource classification, it is clear that subsequent infill and extensional drilling by Blende Silver, coupled with recent metallurgical results and have had a very positive effect on the Blende Mineral Resource. Previous evaluations of the property have focused on the open-pit potential recovering only the sulphide minerals. “Results from recent metallurgical test work indicates Blende mineralogy will respond well to standard process techniques” — Frank Wright, P.Eng., F.Wright and Associates. Zinc and Lead oxide results and recoveries have been incorporated in the new Blende Mineral Resource Estimate.
Table 1. Base Case Mineral Resource (at NSR cutoff grade of $CDN39.35 (ZnEq=2%))
Category Cutoff In situ In situ Grades In situ Metal Content
ZnEq
(%)
Tonnage
(ktonnes)
ZnEq
 (%)
Zn
(%)
Pb
(%)
Ag
(gpt)
NSR
($CDN/t)
OXRAT Zn
(Mlbs)
Pb
(Mlbs)
Ag
(koz)
Indicated 2.0 3,650 5.18 1.98 1.95 35.7 101.87 0.08 159 157 4,192
Inferred 2.0 32,980 5.03 2.01 1.88 32.0 98.91 0.22 1,461 1,364 33,980

*Moose Mountain Technical Services NI 43-101 Resource Estimate and Technical Report dated May 25th, 2018.

The Blende Project is a potential bulk tonnage, open pit approach that offers some distinct cost advantages to other advanced Pb/Zn projects in Canada, which are typically underground. Blende Resource mineralization outcrops at surface, is confined to 2 pit shapes approximately 2 kilometres apart (view map) and remains open in areas northwest, southeast and below the “reasonable prospects of economic extraction” open pit shapes. Blende Silver is positioning to conduct a significant drill program in 2019 to test these potential open pit extensions and step out from mineralized drill hole intercepts at the adjacent Far West, Central, Far East and Shanghai Zones within the >6 kilometre-long Blende mineralized corridor. Further metallurgical testing and sampling will be undertaken to provide for a near-term Preliminary Economic Assessment to evaluate future mine planning, metallurgy and project economics.

Tables 2 and 3 below summarize the Blende deposit Indicated and Inferred Resource, respectively, at varying ZnEq cutoffs with the Base Case highlighted at 2% ZnEq (NSR=$CDN39.35).

Table 2. Base Case Mineral Resource (at NSR cutoff grade of $CDN39.35 (ZnEq=2%))

Pit Area Cutoff In situ In situ Grades In situ Metal Content
ZnEq
 (%)
Tonnage
(ktonnes)
ZnEq
 (%)
Zn
 (%)
Pb
 (%)
Ag
(gpt)
NSR
($CDN/t)
OXRAT Zn
(Mlbs)
Pb
(Mlbs)
Ag
(koz)
West Pit 1.5 2,852 5.18 1.69 2.06 41.7 101.97 0.09 106 129 3,827
2.0 2,585 5.54 1.78 2.21 45.0 108.93 0.10 102 126 3,740
2.5 2,300 5.94 1.88 2.38 49.0 116.95 0.10 95 121 3,623
3.0 2,015 6.40 1.99 2.58 53.6 125.90 0.10 88 114 3,472
3.5 1,733 6.91 2.11 2.79 59.1 136.02 0.10 81 106 3,295
4.0 1,472 7.47 2.23 3.02 65.5 147.07 0.10 72 98 3,100
5.0 1,061 8.63 2.39 3.53 80.6 169.80 0.11 56 83 2,750
                       
East Pit 1.5 1,231 3.97 2.30 1.19 11.9 78.19 0.06 62 32 470
2.0 1,068 4.31 2.45 1.32 13.2 84.79 0.06 58 31 452
2.5 855 4.83 2.64 1.56 15.3 94.94 0.06 50 29 422
3.0 647 5.49 2.84 1.89 18.5 108.06 0.07 41 27 384
3.5 487 6.23 3.02 2.28 22.3 122.55 0.07 32 25 350
4.0 387 6.87 3.14 2.66 25.9 135.25 0.08 27 23 322
5.0 288 7.71 3.24 3.20 30.6 151.75 0.08 21 20 283
                       
Total 1.5 4,083 4.82 1.87 1.80 32.7 94.80 0.08 169 162 4,297
2.0 3,654 5.18 1.98 1.95 35.7 101.87 0.08 159 157 4,192
2.5 3,155 5.64 2.08 2.16 39.9 110.98 0.09 145 150 4,044
3.0 2,662 6.18 2.19 2.41 45.1 121.56 0.09 129 141 3,856
3.5 2,220 6.76 2.31 2.68 51.1 133.07 0.09 113 131 3,645
4.0 1,859 7.35 2.42 2.95 57.3 144.60 0.10 99 121 3,422
5.0 1,349 8.43 2.57 3.46 69.9 165.95 0.10 76 103 3,032
Table 3. Blende Deposit Inferred Mineral Resource
Pit Area Cutoff In situ In situ Grades In situ Metal Content
ZnEq
 (%)
Tonnage
(ktonnes)
ZnEq
 (%)
Zn
 (%)
Pb
 (%)
Ag
(gpt)
NSR
($CDN/t)
OXRAT Zn
(Mlbs)
Pb
(Mlbs)
Ag
(koz)
West Pit 1.5 32,533 4.87 1.85 1.87 32.4 95.85 0.25 1,325 1,343 33,900
2.0 29,538 5.19 1.96 2.00 34.7 102.09 0.24 1,278 1,300 32,955
2.5 26,623 5.51 2.07 2.12 37.1 108.41 0.24 1,217 1,245 31,773
3.0 23,293 5.90 2.20 2.28 40.3 116.17 0.23 1,128 1,172 30,185
3.5 20,037 6.34 2.32 2.47 43.9 124.66 0.23 1,024 1,089 28,306
4.0 16,815 6.83 2.44 2.69 48.4 134.42 0.22 903 998 26,166
5.0 11,695 7.87 2.63 3.18 58.8 154.82 0.22 678 819 22,105
                       
East Pit 1.5 4,296 3.27 2.21 0.74 8.1 64.28 0.06 209 70 1,123
2.0 3,441 3.64 2.42 0.85 9.3 71.66 0.06 183 65 1,024
2.5 2,552 4.13 2.67 1.02 10.9 81.18 0.06 150 57 894
3.0 1,658 4.87 3.00 1.32 13.8 95.91 0.06 110 48 736
3.5 1,113 5.68 3.26 1.71 17.4 111.81 0.07 80 42 621
4.0 778 6.53 3.46 2.18 21.3 128.45 0.07 59 37 532
5.0 493 7.73 3.64 2.93 27.9 152.13 0.08 40 32 443
                       
Total 1.5 36,829 4.68 1.89 1.74 29.6 92.17 0.22 1,534 1,413 35,022
2.0 32,979 5.03 2.01 1.88 32.0 98.91 0.22 1,461 1,364 33,980
2.5 29,175 5.39 2.13 2.02 34.8 106.03 0.22 1,367 1,302 32,668
3.0 24,951 5.84 2.25 2.22 38.5 114.82 0.22 1,238 1,220 30,921
3.5 21,150 6.30 2.37 2.43 42.5 123.99 0.22 1,104 1,131 28,927
4.0 17,594 6.82 2.48 2.67 47.2 134.15 0.21 962 1,035 26,699
5.0 12,188 7.86 2.67 3.17 57.5 154.71 0.21 718 851 22,548

Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that mineral resources will be converted into mineral reserves.

Mineral Resource Estimate ZnEq Cutoff Sensitivity (Base Case 2% ZnEq)

Notes for Tables 1, 2 and 3
  1. The Mineral Resource Estimate in this disclosure is estimated by Moose Mountain Technical Services (MMTS), an independent mining consulting company.
  2. The effective date of this Mineral Resource Estimate is March 27, 2018 and includes all Blende Property drill and trench results to the end of 2017.
  3. This Mineral Resource Estimate represents an increase over the previous Historic (1991) Billiton resource estimate. This is primarily due to additional drilling and increased metal prices, as well as higher confidence in the recoveries due to recent metallurgical testing of both oxide and sulfide material. This deposit has an average oxide content of 21% which allows for recovery of both sulfides and oxides at the recoveries used in this Resource Estimate
  4. The Historic (1991) Billiton resource estimate was based upon 80 diamond drill holes with assay data. A total of 119 diamond drill holes with assay data and 11 trenches with channel sampling were used in the MMTS Blende NI 43-101 Mineral Resource Estimate. An additional 13 holes drilled in 1991 in the periphery of the deposit were not used in the Mineral Resource Estimate.
  5. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
  6. The Mineral Resource Estimate follows Canadian Institute of Mining, Metallurgy and Petroleum (CIM) standards definitions and guidelines.
  7. There are no known environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource Estimate.
  8. The Resource has been constrained by “reasonable prospects for eventual economic extraction” open pits. This was done by creating a Lerchs-Grossman optimized pit using the prices, recoveries, payables and costs as stated below. No penalties were included.
  9. The Equivalent Zn and NSR metal price assumptions of: $US1.20/lb Zn, $US1.00/lb Pb, and $US19.00/oz Ag and an exchange rate of US$0.80 = $1CDN. Metal recoveries are based on metallurgical studies done in 2017 on both the oxide and sulfides material, and are: 70% Zn, 85% Pb and 90% Ag (10% to Zn concentrate and 80% to Pb concentrate). Payables based on comparable smelter terms and a 3% Net Smelter Return (NSR) Royalty are; 85% Zn, 95% Pb and 80% Ag.
  10. Mining costs used for the “reasonable prospects of economic extraction” pit shapes are $CDN1.88/tonne for all material within the potential open pits. Processing, G&A, Surface Services and Tailings costs used have a total of $CDN37.50/tonne material milled. Costs are based on comparable Zn-Pb-Ag projects in North America. The exchange rate is US$0.80 = $1CDN. Open pit slopes are 45 degrees.
  11. The Zinc Equivalent (ZnEq) calculation uses the assumed prices, recoveries and payables resulting in the following equation:
  12. Internal dilution is accounted for in the block model by calculating whole block grades on 6mx6mx6m blocks.
  13. Quality Assurance/Quality Control (QA/QC) has been reviewed in 2013 and again in 2018 by MMTS and is considered to industry standards.
  14. Geologic domains are modelled based on faulting, lithology and grade distribution. Four domains have been modelled, with assays composted to 3m intervals honoring domain boundaries and capped by domain based on cumulative probability plots. Zn, Pb and Ag grades have been interpolated using Ordinary Kriging (OK).
  15. Indicated Resources must contain at least two drill holes within 30m of the block. Inferred Resources have at least 2 drill holes within 120% of the Variogram Range, with extrapolation of the data limited.
  16. Density values are based on a correlation of (Zn+Pb) grades and re-assayed intervals from a sampling program undertaken in the summer of 2017.
*Moose Mountain Technical Services NI 43-101 Resource Estimate and Technical Report dated May 25th, 2018.

Project Geology

The Blende zinc-lead-silver deposit is a large, structurally controlled, breccia-hosted system. The deposit is tabular and dips steeply to the southeast, cutting bedding approximately at moderate to high angles. Mineralization occurs intermittently along the structural zone for about 8 km and is present across widths of up to 200 m. Mineralization consists of yellow, fine to coarse sphalerite and galena. Other sulphide minerals include pyrite and minor chalcopyrite plus tetrahedrite. The surface expression of the deposit is characterised by soil anomalies of up to 10,000 ppm (1%) zinc.

Mineralization

The 8 km long Blende mineralized trend is defined by a number of zones that occur along the axial surface trend of the Blende Antiform. The trend is bound to the east by the virtually unexplored Far East zone and to the west by the promising Far West zone.
Zinc and lead mineralization occurs in five main areas on the Blende Property. From west to east the mineralized zones are named: Far West, West, Central, East and Far East. The principal minerals containing the zinc and lead are sphalerite (ZnS) and galena (PbS) but weathering has converted a significant amount of the near surface sulphide to smithsonite (zinc carbonate) and anglesite (lead carbonate). High silver values are associated with tetrahedrite but one occurrence of native silver was found in drill core in the East zone. Highest silver values, however, tend to come from the West zone.
A number of high grade silver intercepts were seen in some of the deeper holes but these appear to be unrelated to any significant lead-zinc content. The possibility exists for zonation at the property, and deeper favourable limy horizons may be present. In addition, copper rich zones, particularly at the lesser-explored west end of the West Zone area, may indicate further lateral zonation associated with mafic sills. Step-out drilling in 1994 confirmed the continuation of good-grade mineralization westward from the previous limit of the West zone, with the addition of significant copper values:
  • Hole 94-81 contained 14.9 m of mineralization assaying 228.4 g/t (6.66 oz/t) silver, 9.71% lead, 5.48% zinc and 0.78% copper from 9.2m to 24.1 m
  • Hole 94-84 contained 8.5 m of mineralization assaying 136.1 g/t (3.97 oz/t) silver, 6.74% lead, 3.65% zinc and 2.43% copper from 45.5 m to 54 m

Exploration Program

Blende Silver is positioning to conduct a significant drill program to test potential open pit extensions and step out from mineralized drill hole intercepts at the adjacent Far West, Central, Far East and Shanghai Zones within the >6 kilometre-long Blende mineralized corridor. Further metallurgical testing and sampling will be undertaken to provide for a near-term Preliminary Economic Assessment to evaluate future mine planning, metallurgy and project economics
*Please refer to cautionary note.

**A qualified person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves, the Company is not treating the historical estimate as current mineral resources or mineral reserves and the historical estimate should not be relied upon.

Projects

Yuty Prometeo Project – Paraguay

The Yuty Prometeo Project consists of the San Jose and Uno Concessions, together covering approximately 90,000 hectares within the highly prospective Paraná Basin in southeastern Paraguay. This project is strategically located adjacent to Uranium Energy Corp.’s (UEC) Yuty Deposit, which currently hosts an NI 43-101 compliant resource of 8.96 million pounds of U₃O₈. 

The Yuty Prometeo Project leverages favorable regional geology and existing exploration data, indicating continuity with known uranium mineralization trends that extend from UEC’s nearby holdings. 

Yuty Prometeo Project – Paraguay

Yuty Prometeo Project Yuty Prometeo Project – Paraguay Location: Paraná Basin, Southeastern Paraguay Size: ~90,000 hectares (222,395 acres) Status: Early-stage exploration Commodities: Uranium (U₃O₈) Contiguous Operator: Uranium Energy Corp.

Pocitos 1 Lithium Brine Project

Pocitos 1 Lithium Brine Project – Salta, Argentina Location: Salar de Pocitos, Puna Plateau, Salta Province, ArgentinaSize: ~800 hectaresStatus: Advanced exploration stageCommodities: Lithium (brine)Infrastructure Proximity:

Brussels Creek

Summary The Brussels Creek Project is an exploration stage project located in the Kamloops Mining District, British Columbia, Canada, about 24 km west of Kamloops,

Murray Ridge (Pinchi Lake)

The analogous suite of ultramafic intrusions are hosts to widely disseminated, coarse grained awaruite mineralization on the Decar (Murray Ridge) property of the First Point

Georgia Lake West & North

Vanguard Mining’s Georgia Lake North & West lithium properties are contiguous and on trend with RockTech Lithium’s (RCK – CSE) Georgia Lake lithium property, which

yuty-img

Yuty Prometeo Project – Paraguay

Yuty Prometeo Project Yuty Prometeo Project – Paraguay Location: Paraná Basin, Southeastern Paraguay Size: ~90,000 hectares (222,395 acres) Status: Early-stage exploration Commodities: Uranium (U₃O₈) Contiguous Operator: Uranium Energy Corp. (NYSE American: UEC) Target Formation: Upper Permian–Carboniferous Contact  Overview The Yuty Prometeo Project consists of the San Jose and Uno Concessions, together covering approximately 90,000 hectares within the highly prospective Paraná Basin in southeastern Paraguay. This project is strategically located adjacent to Uranium Energy Corp.’s (UEC) Yuty Deposit, which currently hosts an NI 43-101 compliant resource of 8.96 million pounds of U₃O₈.  The Yuty Prometeo Project leverages favorable regional geology and existing exploration data, indicating continuity with known uranium mineralization trends that extend from UEC’s nearby holdings.  Uno Concession  Area: ~27,666 hectares (68,368 acres) Contiguous to: UEC’s Yuty Project  The Uno Concession has been the focus of historical exploration, including 28 completed drill holes that returned uranium assays ranging from 0.05% to 0.10% U₃O₈. Geophysical surveys, drilling data, and surface sampling collectively suggest the Prometeo block is geologically on-trend with UEC’s adjacent Transandes Block, making it a high-priority target for follow-up exploration and resource delineation.  San Jose Concession  Area: ~62,210 hectares (153,754 acres) Location: ~100 km NW of

Read More »
pocitos-feature-img

Pocitos 1 Lithium Brine Project

Pocitos 1 Lithium Brine Project – Salta, Argentina Location: Salar de Pocitos, Puna Plateau, Salta Province, ArgentinaSize: ~800 hectaresStatus: Advanced exploration stageCommodities: Lithium (brine)Infrastructure Proximity: Township of Pocitos (~10 km; gas, electricity, accommodation available) Overview The Pocitos 1 Lithium Brine Project is located on the Salar de Pocitos in Salta Province, within the prolific Puna Plateau—one of the most important geological settings for lithium brine deposits globally. The Puna Plateau is characterized by elevated fault-bounded blocks separated by elongated, endorheic (closed) basins that act as natural traps for fluids and host thick evaporite deposits. These closed basins, combined with a dry climate and high rates of evaporation, provide the ideal environment for the accumulation and concentration of lithium-rich brines. Surrounding mountain ranges have a north–south (meridian) orientation and their uplift, driven by block faulting, has shaped the basins and controlled sediment input. The Pocitos and Pozuelos basins are divided by the Cordón de Pozuelos, a prominent structural high composed primarily of Ordovician-age rocks that show slight metamorphism. At the base of the surrounding ranges, extensive coalescing alluvial fans funnel sediments and fluids into the salar system, playing a critical role

Read More »

Brussels Creek

Summary The Brussels Creek Project is an exploration stage project located in the Kamloops Mining District, British Columbia, Canada, about 24 km west of Kamloops, BC. Mineral tenure consists of 66 cells, covering approximately 13.5 km2. HISTORY From 1969 to 2001, exploration was carried out by a variety of companies on various parts of the property. Of particular note, in 1983 and 1984, AVF Minerals Ltd. staked three claims (Aduf 1, Aduf 2 and Aduf 3 fractions, 4 units) covering approximately 85 ha. The company then conducted a program of general prospecting, establishment of a field grid, geological mapping of 100 ha at a scale of 1:2000 and rock chip geochemistry. Seventy-three representative samples of outcrop materials were assayed for gold, silver and arsenic. Results from this program were encouraging and led to the current interest. In 2019, the area was again staked by David Pollard on behalf of the ADUF Mining Syndicate. No significant field work was carried out in 2019, although a third party took seven representative samples during a site visit in September 2019. In February 2020, the property was optioned to Syber Mining Corp. who subsequently

Read More »

Murray Ridge (Pinchi Lake)

The analogous suite of ultramafic intrusions are hosts to widely disseminated, coarse grained awaruite mineralization on the Decar (Murray Ridge) property of the First Point Minerals, approximately 60 km northwest. Compositionally, awaruite (Ni2Fe-Ni3Fe) is comprised of approximately 75% nickel, 25% iron and 0% sulfur, and therefore it is considered “natural steel”. Absence of sulfur allows a concentrate to be shipped directly to steel mills without incurring smelting and refining costs, and minimal environmental problems. History The economics of nickel-iron alloy deposits are potentially very favorable as they avoid the significant cost associated with nickel sulphide deposits required for smelting and environmental mitigation and large amounts of energy and acid required for the processing of laterite nickel deposits. Exploration activity in the region dates back to mid 1860’s when placer gold was discovered on lower Fraser and Thompson Rivers. In 1937, a modern exploration followed the discovery of cinnabar (ore of mercury) by J.G. Gray, a geologist with the Geological Survey of Canada, in the Cache Creek limestone on the north shore of the Pinchi Lake. Subsequently numerous other mercury showings were discovered within the Pinchi Lake fault zone in a

Read More »

Georgia Lake West & North

Vanguard Mining’s Georgia Lake North & West lithium properties are contiguous and on trend with RockTech Lithium’s (RCK – CSE) Georgia Lake lithium property, which is located approximately 160 km northeast of Thunder Bay within the Thunder Bay Mining Division and is host to a number of spodumene-bearing pegmatites. Lithium mineralization was discovered in 1955 and subsequently explored by several historic owners. RockTech acquired the licenses in 2009 and carried out several drill campaigns until 2017. Based on a total of 351 drill holes with a combined length of 47,384 m an NI43-101 compliant resource estimate of 6.58 million tonnes in the measured and indicated category and 6.72 million tonnes in the inferred category was published in August 2018. Majority of pegmatites are hosted by Archaean meta-sediments near large masses of granite:  

Read More »